Book Consultation

Gondaliya CPA

Corporate Tax Filing Experts

Tax Accountant for Construction Project Management Firms in Ontario and Across Canada

One clause decides your entire revenue line. Sign as the owner’s agent and the trade contracts are not yours, so what you report is the fee; sign at risk and the construction value is your revenue with the trades below it as cost. We read that position engagement by engagement, keep agency files and at-risk files apart inside the same fiscal year, and settle one consistent treatment for every cost you recharge. Then we file the T2 with the site office, furniture and office equipment in Class 8 at 20% and estimating software in Class 12 at 100%, charge 13% on the fee under the Excise Tax Act, carry billings raised ahead of the work as deferred income under paragraph 12(1)(a) with the paragraph 20(1)(m) reserve, and keep the doubtful-debt reserve apart from the write-off when an owner stops paying. Flat AFFORDABLE fees, never hourly.

1300+
5-Star Google Reviews
✅ REGISTERED CPA FIRM – VERIFY NOW

AFFORDABLE Construction Project Management Firm Tax Accountant

Two firms can run the identical job on the identical site and report revenue twenty times apart, and the only thing separating them is how the contract was signed. Manage the project as the owner’s agent and the trade contracts belong to the owner: you never own the work, and your revenue is the fee you charge for running it. Sign that same project at risk and you have taken the whole job into your own name, so the construction value is your revenue and every trade invoice is your cost. Most firms in this business have done both, sometimes inside one year, and almost none of their books show the difference. Which position you hold is a determination on the contract and on who genuinely carries the risk of cost and of performance, made engagement by engagement rather than assumed from the last job. At Gondaliya CPA that determination is the first thing we do on your file, and the reporting is built on top of it, with AFFORDABLE flat-fee support that keeps your filings clean and stops you paying tax you do not owe.

As an accountant for construction project management firms, we work with owner’s representatives and project monitors, construction managers running trade packages for institutional and municipal owners, design-build and development managers, and firms that take on at-risk delivery for private clients across Ontario. You get attention through the year rather than one rushed conversation in June, and a set of statements that says plainly which of your revenue was a fee and which was construction value passing through you.

Let us take the contracts and the numbers so you can stay on the projects.

Gondaliya CPA team - accounting and tax services for construction project management firms

Our Official Partners

Google Reviews
CPA Ontario
QuickBooks
Wagepoint
Xero
Stripe
Rotessa
Hubdoc
ADP

Accounting That Understands How a Construction Project Management Firm Actually Works

No other business in construction has a revenue line that can move by a factor of twenty without a single hour of the work changing. Your fee is small beside the value you direct, your position shifts from owner’s agent on one job to principal on the next, and the costs you recharge may or may not belong in revenue at all. At Gondaliya CPA we start from the contract rather than the invoice, and report each engagement on the footing it was actually signed on.

📄

Agent or At Risk Decides Revenue

As the owner’s agent your revenue is the fee. At risk, the whole construction value is revenue with the trades as cost. Same scope, same site, and two sets of statements that do not describe the same company.

📑

The Contract Is the Evidence

Which position applies turns on what the signed documents say and on who really carries cost and performance risk. That determination belongs in the file, made once per engagement and written down.

💵

Recharges Follow the Same Test

A cost you incur and bill on is not automatically revenue. Whether it grosses up the top line or nets against it follows the agency-or-principal analysis, applied the same way every time.

📅

Both Positions in One Year

A firm that ran agency work in spring and signed an at-risk package in autumn cannot blend them. Each engagement is accounted for on its own terms, or neither figure means anything.

Stay Compliant and Minimize Your Construction Project Management Tax

For a construction project management firm, filing correctly and paying the least legal tax are the same exercise, because both begin with the position you hold on each contract. We keep the returns on schedule and claim every fee-side cost the T2 allows, while making sure the revenue line itself is the one your contracts support.

📋

What the Gross Figure Changes

Reporting at risk rather than as agent changes what every outside reader sees. A firm with an $850,000 fee book and a $19,000,000 at-risk revenue line presents as a completely different company to a lender, a surety and an insurer, and every ratio any of them calculates off revenue moves, although the cash inside the business has not shifted at all. It does not change taxable income, so it does not by itself consume the small business limit under section 125 of the Income Tax Act, which is measured on active business income and not on revenue — a point worth stating because it is widely assumed the other way round. It does decide how quickly you cross the $30,000 registration threshold in the Excise Tax Act, measured over four consecutive calendar quarters, which a firm reporting gross construction value clears on its first project. And because an at-risk signature makes you a party to the construction contract itself, obligations that never reach an agency engagement attach to you.

✅

CRA Obligations for Construction Project Management Firms

Compliance on this file is not one return in June. We file the T2 on the revenue line your contracts support, file GST/HST returns charging 13% on the fee and recovering input tax credits on office and overhead costs, handle fees billed ahead of the work as income under paragraph 12(1)(a) with the offsetting paragraph 20(1)(m) reserve, keep the doubtful-debt reserve under 20(1)(l) apart from the 20(1)(p) write-off, reconcile payroll source deductions to the PD7A, put WSIB coverage in place from your first hire, and answer the T5018 question on the facts of what your firm actually does. CRA opens a project management file at those points more often than anywhere else.

📈

Year-End Deliverables for Construction Project Management Firms

A year-end here has to show which revenue was fee and which was construction value carried at risk, because a reader who cannot separate the two cannot read the statements at all. We produce a trial balance and financial statements that split them, show recharged costs on the treatment your contracts support with that treatment disclosed, carry receivables against each owner’s payment terms, take fees billed ahead of the work to deferred revenue, and state the office lease and office equipment separately, then file the T2 with GIFI that ties back to the HST returns you filed during the year. Every piece of it lands on time.

Accounting & Tax Experts for Construction Project Management Firms

Gondaliya CPA construction project management accounting expertsGondaliya CPA construction project management tax experts
  • AFFORDABLE + Registered CPA Firm
  • Business and Corporate Tax Expert
  • Small & Medium Business Expert
  • Accounting, bookkeeping, and tax filing
  • CPA (Chartered Professional Accountant)
  • 1300+ 5-star Google reviews
  • 30-Day Money-Back Guarantee
  • 60-Day Fees Matching Policy

Why Choose Our Accounting Services for Construction Project Management Firms?

1
🎯

Tax Planning — Fee Timing & Structure

We settle when a percentage or milestone fee is actually earned, hold billings ahead of the work in deferred income with the reserve claimed, and keep the small business limit working for you.

2
💳

Consulting — Agency or At Risk

We read every contract, settle whether you are the owner’s agent or a principal on each one, and set the revenue and cost presentation that position demands before the year closes.

3
🛡

CRA Representation — Revenue & Status

When CRA queries your revenue line, a recharged cost or a site worker’s status, we assemble the contracts and reconciliations and answer it, seeking relief on Form RC4288 where an earlier error caused penalties.

4
🏢

Bookkeeping — Cash and the Exit

We build the cash plan that funds payroll while an owner’s payment cycle runs long, produce statements a lender can underwrite, and structure the eventual share sale years ahead of it.

★
Registered CPA Ontario
★
1300+ ★★★★★
Google Reviews
★
30-Day Money-Back Guarantee
★
60-Day Fees-Matching Policy
ACTIVELY ACCEPTING
Construction Project Management Clients
Includes personal T1 filing for you and your family
Convenient Availability
Weekend and evening support until 9 PM
Always Within Reach
Just a call away when you need us

Construction Project Management Tax and Accounting Services in Ontario

📄

Corporate Tax Filing (T2) for Construction Project Management Firms

T2 preparation with the revenue line your contracts actually support, agency and at-risk engagements reported separately, and capital cost allowance claimed properly on Schedule 8.

💳

Bookkeeping & Accounting for Construction Project Management Firms

Engagement-level books that keep fee income apart from construction value carried at risk, with every recharged cost coded on one documented treatment.

💵

Payroll Services for Construction Project Management Firms

Site and office payroll with WSIB from the first hire, PD7A remittances on schedule, and T4 and T4A slips filed ahead of the deadline.

🧾

GST/HST Filing for Construction Project Management Firms

AFFORDABLE HST filing with 13% charged on your fee, registration timing checked against the $30,000 threshold, and every input tax credit recovered.

📈

Tax Planning for Construction Project Management Firms

Planning on when a fee is earned, how billings ahead of the work are reserved, owner compensation, and the structure you will eventually sell out of.

⏳

Corporate Catch-Up Filing for Construction Project Management Firms

File overdue T2 and HST years, rebuild the contract and fee record behind each engagement, and get back into CRA compliance without guesswork.

🛡

CRA Audit Resolution for Construction Project Management Firms

Support on revenue presentation, recharged cost and worker status reviews, handled from the first CRA letter through to the final answer.

📊

CPA Financial Statements (Notice to Reader) for Construction Project Management Firms

Compiled statements a lender and a surety will actually read, with fee revenue and at-risk construction value shown on separate lines.

🏢

Incorporation Services for Construction Project Management Firms

Incorporation set up so the corporation begins with a chart of accounts able to hold agency and at-risk engagements apart from day one.

📒

Catch-Up Bookkeeping Services for Construction Project Management Firms

Years of fee invoices, recharged cost support and trade billings reconstructed and reconciled, so your revenue line is finally defensible.

🌐

US Corporation & LLC Tax Filing for Construction Project Management Firms

Cross-border filing where you manage projects for American owners or your shareholders are non-resident, covering withholding and foreign property reporting.

📜

Voluntary Disclosure Program for Construction Project Management Firms

Come forward on a misreported revenue line, fee income never picked up or HST never charged, and cancel penalties through a Voluntary Disclosures Program application.

Accounting & Tax Services Tailored for Construction Project Management Firms

Genuine practitioner depth for owner’s representatives, construction managers running trade packages, design-build and development managers, and firms that sign at-risk delivery. The revenue line on this file is decided by one clause in a contract, and everything downstream of it follows.

  • We prepare the T2 with GIFI on Schedule 100 and Schedule 125, and we put fee income and construction value carried at risk on separate lines rather than one revenue total, because your lender and CRA both read that split.
  • Where you contracted as the owner’s agent the trade contracts are not yours and your revenue is the fee; where you signed at risk the whole contract value is revenue with the trade cost sitting below it.
  • Which of those two positions applies is a determination on the signed documents and on who actually carries the cost and performance risk, so we settle it engagement by engagement and keep the reasoning on the file.
  • We claim capital cost allowance on Schedule 8 with the site office, furniture and office equipment in Class 8 at 20%, vehicles in Class 10 at 30%, computers in Class 50 at 55%, and estimating software in Class 12 at 100%.
  • A firm that ran agency engagements in one quarter and took an at-risk package in the next has to report each on its own terms; blending the two had overstated revenue by $310,000 on a file we inherited last year.
  • We set the ledger up so every engagement carries its own contract position, which stops an agency file quietly absorbing trade cost that belongs to an at-risk job, and stops the reverse happening too.
  • Fee income is tracked by engagement against the fee basis in the contract, whether that is a fixed amount, a percentage of construction value or cost plus with a guaranteed maximum, because each of the three is earned differently.
  • Costs you incur and recharge to the owner are coded on one documented treatment across every engagement, instead of sitting inside revenue on one job and netting against expense on the next one.
  • We keep the six years of records section 230 of the Income Tax Act calls for: the signed contract, the fee basis, the support behind each recharged cost, and the trade invoices on engagements you hold yourself.
  • Monthly reconciliation in QuickBooks Online or Xero with Dext capturing the paperwork recovered $26,400 of input tax credits for one firm whose recharged cost support had simply never been entered anywhere.
  • Whether a site superintendent or a coordinator is your employee or an independent contractor is decided on the facts of the working relationship and not on the wording of an invoice, and we test and document every role.
  • We run office and site payroll, withhold income tax, CPP and EI, and get every remittance to CRA on time against the PD7A, because a late one draws a graduated penalty climbing as high as 10%.
  • We register your WSIB coverage before the first hire, because a coordinator who spends any part of the week on an active site is an exposure the owners cannot sensibly carry personally.
  • We file T4 slips and the T4 Summary by the last day of February, and issue a T4A where a payment for services genuinely went to a self-employed adviser rather than to somebody working as an employee.
  • Ontario Employer Health Tax starts once payroll clears the $1,000,000 exemption, and one firm walked straight past that line the year its site staff went from four people to eleven without anyone noticing.
  • Project management services are a taxable supply, so your fee carries 13% in Ontario, and we file on that basis under the Excise Tax Act with input tax credits claimed on the operating costs behind the fee.
  • Registration is required once taxable revenue passes $30,000 over four consecutive calendar quarters, a line a firm reporting gross at-risk construction value crosses on its first project instead of after years of fee work.
  • Where a cost is recharged to the owner, the tax treatment follows the same agency-or-principal analysis as the revenue presentation, so we settle that question once for the engagement and bill consistently with it.
  • We reconcile every return to the revenue in the general ledger before it is filed, because a return that will not tie back to the books is the shortest route to a question from CRA.
  • Recovering input tax credits sitting in unclaimed office rent, software subscriptions, professional fees and vehicle costs returned $14,900 to one firm across eight filing periods nobody had ever gone back and looked at.
  • A fixed fee, a percentage of construction value and cost plus with a guaranteed maximum do not merely price differently. They change when the fee is earned, and the planning has to follow the earning pattern.
  • Amounts billed ahead of the work are included in income under paragraph 12(1)(a) of the Income Tax Act, and we claim the offsetting reserve under paragraph 20(1)(m) so you are not taxed early on work not yet done.
  • We keep active business income inside the small business limit under section 125, and check the associated corporation rules where the owners hold a second company that also takes construction work in its own name.
  • Moving a percentage-fee milestone across a year-end where the contract genuinely allowed it deferred $71,000 of income for one firm, and cost nothing at all beyond the timing of a single invoice.
  • We plan the owner compensation mix and the eventual share sale well in advance, so the $1.275M Lifetime Capital Gains Exemption under section 110.6 is available to you rather than discovered about a year too late.
  • We rebuild the unfiled years from the contracts themselves, establishing engagement by engagement whether the revenue was a fee or the construction value, because that single answer changes the income of every year involved.
  • The T2 late-filing penalty runs at 5% of the balance owing plus 1% for each complete month the return is late, to a maximum of twelve months, which is why the oldest year always goes in first.
  • We rebuild the capital cost allowance pools across the missing years, splitting a single blended equipment account back out into Class 8, Class 10, Class 50 and Class 12 so that the claims are supportable.
  • We reconstruct the recharged cost support from bank records, owner billings and trade invoices, because a catch-up filing that cannot show what a recharge was for invites exactly the reassessment it was meant to head off.
  • Filing four neglected years for one firm and correcting its revenue basis along the way brought the assessed balance down by $58,000 against the figure CRA had already estimated before we were engaged.
  • When CRA asks why your revenue is a fee rather than the construction value, we produce the management contract, the trade agreements and the risk analysis that stand behind the position you actually reported.
  • Section 152(7) of the Income Tax Act allows CRA to assess without relying on the information supplied to it, which is what tends to happen when nothing in the file explains the revenue presentation at all.
  • On a recharged cost review we show the treatment applied to the engagement, the contractual basis for choosing it and the consistency across every other engagement, which is usually what closes the question fastest.
  • Where a site worker’s status is challenged we assemble the agreements, the schedules and the arrangement as it actually operated, so a single-year review does not spread into the two earlier years CRA can still reach.
  • We file the Notice of Objection inside the 90-day window and apply for relief on Form RC4288, which removed $23,500 of penalties and interest for a firm whose previous adviser had misreported two full years.
  • We prepare compilation engagement financial statements under CSRS 4200 for the lender, the surety and the bonding review, covering the two fiscal years a credit decision on this kind of firm normally reaches back over.
  • The statement of operations separates fee revenue from construction value carried at risk, because a reader looking at one blended total cannot tell a $900,000 fee business from a $20,000,000 one.
  • Recharged costs are presented on the treatment your contracts support, disclosed so that the reader knows which of the two it is, and held on that same basis consistently across both years shown.
  • Receivables are set against each owner’s payment terms, and fees billed ahead of the work sit in deferred revenue rather than inflating a year in which you have not yet earned them.
  • We turn compiled statements around inside 30 days of getting complete records, which is what let one firm close a $1,200,000 operating facility with a week left before its bonding deadline.
  • Incorporating puts limited liability between the owners and at-risk work, and taxes the first $500,000 of active business income at roughly 11.2% (from July 1, 2026) in Ontario instead of a personal rate topping out at 53.53%.
  • We complete the section 85 rollover on Form T2057 to move existing contracts, equipment and goodwill in at elected amounts, rather than letting the transfer be treated as a sale at fair market value.
  • The opening Class 8, Class 10, Class 50 and Class 12 schedules are set from the rollover, with the office lease carried as Class 13, or the building itself as Class 1 where the corporation owns it.
  • We open the corporation’s Business Number, HST and payroll accounts inside the first month, so the first engagement it signs is billed, collected and reported by the right entity from the very beginning.
  • The chart of accounts is built from day one to hold agency and at-risk engagements apart, which is a great deal cheaper than the $18,000 reconstruction one firm paid us for four years after incorporating.
  • We rebuild neglected books from bank records, owner billings, trade invoices and the contracts sitting behind them, because nothing can be filed until the revenue on each engagement has a document standing behind it.
  • Every engagement in the backlog is classified against its contract position first, since posting at-risk trade cost into an agency file is the one error that makes a caught-up ledger worth nothing.
  • We split a single blended equipment account into Class 8, Class 10, Class 50 and Class 12 across the caught-up years, which is very nearly always the state this file reaches us in.
  • Recharged cost support is matched back to the owner billing that carried it, so a recharge can be shown to be a recharge rather than unexplained revenue or a deduction with nothing behind it.
  • Unentered office, software, professional and vehicle costs across a two-year backlog held $31,700 of input tax credits for one firm, which on its own more than paid for the whole catch-up engagement.
  • Where you manage a project for an American owner, or a US developer engages your firm on a Canadian site, we review where the service is supplied and how the fee is taxed before the first invoice is raised.
  • A dividend out of Canada to a non-resident shareholder is subject to Part XIII tax at 25% unless a treaty reduces it, and both the remittance and the NR4 slip have to be dealt with properly.
  • The owners’ specified foreign property is reported on Form T1135 once its cost crosses $100,000, and the penalties there attach to the late form itself, even in a year when no tax was owing at all.
  • A US citizen or green card holder among your shareholders pulls American filing requirements into a Canadian corporation, and the two sets of returns have to be planned together rather than prepared by strangers.
  • Foreign tax credits only work where the two returns are reconciled against each other, and getting that right returned $9,800 to one owner who had been paying twice on the very same income.
  • Where at-risk engagements were reported as though they had been agency work, or agency work was grossed up as though you held the trade contracts, the correction reaches every open year and a disclosure beats a reassessment.
  • We file the taxpayer agreement on Form RC199 with a full reconstruction from the contracts, the owner billings and the bank record, so the years being corrected are properly supported instead of estimated.
  • Coming forward before CRA contacts you is the condition that makes a disclosure valid, and it is the only thing separating a managed correction from an enforcement file with your name on it.
  • Fee income never picked up, HST never charged on a management fee, and recharged costs handled two different ways in two different years are all correctable through the same submission at the same time.
  • One firm that had misreported its revenue basis across three years came forward and had $47,000 of penalties cancelled, along with relief on the interest CRA had been accumulating on the older years.

Construction Project Management Contract & Tax Check

Six questions on your contract position, your revenue line, your recharged costs, your fee timing, your HST and whether incorporating is the right move. No fee shown.

1. Does your file record whether each engagement is agency or at risk?

2. Does your reported revenue line match the position you actually signed?

3. Are recharged costs treated the same way on every engagement?

4. Is a percentage or milestone fee recognized only when it is earned?

5. Is 13% HST charged on your project management fee?

6. Is your construction project management firm incorporated?

Free CPA Consultation for Construction Project Management Firms

Case Studies: Construction Project Management Accounting & Tax

Kingston Construction Management Firm — The Year Two Positions Were Blended

The problem: A Kingston firm ran four owner’s-representative engagements and one at-risk package in a single fiscal year. The at-risk job was signed in the firm’s own name, the firm held the trade contracts and carried the cost of performance, yet the bookkeeper reported only the management fee on it, exactly as on the four agency files. The trade payables had nowhere to sit, and the bank had underwritten an operating line against a company that did not exist.

What we did: We read all five contracts, documented the risk position on each, restated the at-risk engagement to gross revenue with the trade cost below it, left the four agency engagements on fee revenue and amended the affected return.

The result:

  • $9,100,000 of at-risk revenue correctly reported
  • $62,000 of penalty exposure removed
  • Operating line re-underwritten on statements that reconcile

Aurora Owner’s Representative — The Fee Billed Before It Was Earned

The problem: An Aurora firm billed 40% of a percentage-based fee at signing on every engagement, then took all of it into income on receipt. On a long municipal project that meant nearly a year of revenue reported before any of the work behind it had been performed, with corporate tax paid a full year early. Nothing sat in deferred revenue, and the reserve for amounts billed ahead of the work had never been claimed.

What we did: We identified the amounts included in income under paragraph 12(1)(a) of the Income Tax Act, claimed the offsetting reserve under paragraph 20(1)(m) on services not yet rendered, and restated revenue to each contract’s earning pattern.

The result:

  • $71,000 of income deferred into the year it was earned
  • Recognition tied to each contract’s earning pattern
  • Reserve claimed on every advance billing since

Halton Hills Development Manager — The Recharges Nobody Could Explain

The problem: A Halton Hills firm recharged site office costs, temporary services and its own staff time to owners on some engagements and absorbed them on others, with no pattern in the ledger. Some sat in revenue with the cost beneath, some netted against expense, a few both ways. When CRA asked what one $84,000 recharge was for, no document answered it, and nobody could say which engagements had been grossed up.

What we did: We went back through every contract to establish whether the firm acted as agent or as principal on each recharge, set one treatment per position, recoded three years of transactions and answered CRA from the rebuilt record.

The result:

  • Three years of recharges recoded to one documented basis
  • CRA query closed with no adjustment made
  • Every recharge now traceable to a contract clause

Our Simple Process

How We Work With Construction Project Management Firms

Know Exact Fees within 2 Minutes NOW

A defined sequence you can see the whole way through, so you always know what we hold, what we are doing with it and what comes next.

Here’s a simplified process approach:
Step 1

Kickoff (Document Request)

Collect prior T2 returns, every signed management and construction contract, the trade agreements on engagements you hold, fee schedules, recharged cost support, owner billings, payroll records, the office lease and bank statements.

Step 2

First 30 Days (Cleanup & Setup)

Read the contracts, document the agency or at-risk position on each engagement, set the chart of accounts to hold the two apart, and rebuild the Class 8, 10, 50 and 12 schedules.

Step 3

Monthly Close

Engagement revenue on its contract position, recharged costs on one documented treatment, fees billed ahead of the work carried forward, HST filed and tied to the ledger, payroll and PD7A agreed.

Step 4

Quarterly Planning Review

Fee timing against each contract’s earning pattern, owner compensation, the small business limit, receivable exposure on slow-paying owners, and whether an at-risk engagement earns the balance sheet it occupies.

Step 5

Year-End Close & T2 Filing

Trial balance, statements with fee revenue and at-risk construction value on separate lines, recharge treatment disclosed, deferred revenue and reserves settled, and the T2 with GIFI filed.

Get Your Construction Project Management Taxes Done Right Today

Transparent Pricing for Construction Project Management Firms

Affordable Pricing for Construction Project Management Firms

Know Exact Fees within 2 Minutes NOW

We believe in clear, upfront pricing so you know exactly what to expect. All fees include HST.

  • Tax Preparation (Corporation) — From $400
  • Tax Return Filing (Corporation) — From $400
  • Tax Compliance Audit — FREE CRA audit support for our clients
  • Tax Strategy — FREE for our clients
  • Accounting Base Plan — From $100 per month
  • Bookkeeping Management — Free for our Accounting clients
  • Financial Reporting — Free for our Accounting clients
  • Business Formation — Flat $35
  • Incorporation Process — Flat $35
  • Entity Setup Assistance — Flat $35
  • Full-Service Payroll — From $125 per month

Payment is by Interac e-Transfer to info@gondaliyacpa.ca only. Security question: Not Applicable, as auto-deposit is enabled.

Meet Your Lead Construction Project Management Accountant

Meet your lead construction project management accountant. The same two people read your contracts and file your return every year, so you always know exactly who to call.

Sharad Gondaliya CPA

Sharad Gondaliya, CPA

Principal

Bio

647-212-9559
sharad@gondaliyacpa.ca

Vandana Goel CPA

Vandana Goel, CPA

Accounting Specialist

Bio

647-250-0242
vandana@gondaliyacpa.ca

What Our Clients Say

More than 1300 five-star reviews, from owners of construction, professional services and project delivery businesses in Ontario and right across Canada.

Serving Construction Project Management Firms Across Ontario

Our CPA team works with construction project management and construction management firms throughout Ontario. We know why the same scope can produce two completely different revenue lines, what has to be in the file to support the one you reported, and what CRA asks for when it opens a project management engagement.

Toronto (ON)

55 Queen St E Ste 1205, Toronto, ON M5C 1R6, Canada

+1 (647) 212-9559

9:00 AM – 8:30 PM (Mon – Sun)

Mississauga (ON)

2100 Camilla Rd #716, Mississauga, ON L5A 2J8

+1 (647) 212-9559

9:00 AM – 8:30 PM (Mon – Sun)

Brampton (ON)

4 Starhill Crescent, Brampton, ON L6R 2P9, Canada

+1 (647) 212-9559

9:00 AM – 8:30 PM (Mon – Sun)

Scarborough (ON)

24 Clementine Square, Scarborough, ON M1G 2V7, Canada

+1 (647) 212-9559

9:00 AM – 8:30 PM (Mon – Sun)

Vaughan (ON)

19 Cabinet Crescent, Woodbridge, ON L4L 6H9, Canada

+1 (647) 212-9559

9:00 AM – 8:30 PM (Mon – Sun)

Oshawa (ON)

210 Durham St, Oshawa, ON L1J 5R3, Canada

+1 (647) 212-9559

9:00 AM – 8:30 PM (Mon – Sun)

Ottawa (ON)

2090 Neepawa Ave a314, Ottawa, ON K2A 3L6, Canada

+1 (647) 212-9559

9:00 AM – 8:30 PM (Mon – Sun)

Etobicoke (ON)

60 Stevenson Rd #1601, Etobicoke, ON M9V 2B4, Canada

+1 (647) 212-9559

9:00 AM – 8:30 PM (Mon – Sun)

Hamilton (ON)

70 Starling Dr, Hamilton, ON L9A 0C5, Canada

+1 (647) 212-9559

9:00 AM – 8:30 PM (Mon – Sun)

Guelph (ON)

1155 Gordon St, Guelph, ON N1L 1S8, Canada

+1 (647) 212-9559

9:00 AM – 8:30 PM (Mon – Sun)

Windsor (ON)

4387 Guppy Ct, Windsor, ON N9G 2N8, Canada

+1 (647) 212-9559

9:00 AM – 8:30 PM (Mon – Sun)

North York (ON)

150 Graydon Hall Dr #912, North York, ON M3A 3B2, Canada

+1 (647) 212-9559

9:00 AM – 8:30 PM (Mon – Sun)

Construction Project Management Accounting & Tax FAQs

Should I incorporate my construction project management firm?
Incorporation gives you limited liability, which matters most on at-risk work where the trade contracts sit in your own name. It also moves the rate. Inside a corporation the first $500,000 of active business income is taxed at about 11.2% in Ontario, where the same income earned personally can reach 53.53% at the top. The real test is whether the firm earns more than its owners draw out, because only the retained surplus gets any benefit from the deferral. There is a second reason on this file. A corporation with clean engagement-level records is the only version of the business a lender or a surety can assess, and an unincorporated practice almost never has them. The section 85 rollover on Form T2057 is how existing contracts, goodwill and equipment move in at elected amounts instead of being treated as sold, and we handle that as part of the incorporation.
Do I report my fee or the whole construction value as revenue?
It depends entirely on the position you contracted in, and both answers are right in the right circumstances. Where you act as the owner’s agent, the trade contracts belong to the owner, you never own the work being performed, and your revenue is the fee you charge for managing it. Where you sign at risk, you hold those trade contracts in your own name and carry the risk of cost and of performance, so the whole contract value is your revenue and the trade cost is your cost. The same scope on the same site can therefore produce revenue lines twenty times apart. What we will not do is tell you from the outside which of the two you are, because that is a determination on your own contracts and on who genuinely bears the risk.
What decides whether I am acting as agent or at risk?
The signed documents and the substance behind them, read together. The questions that decide it are which party the trade contracts name, who is liable to the trades if the owner stops funding the work, who bears the cost of putting defective work right, who absorbs an overrun and who keeps a saving, and whether what you earn is a fee or a margin on the whole job. A document that calls you an agent while leaving the cost of performance sitting on you will not settle the question, and neither will the reverse. It is a determination of fact and law, made engagement by engagement, made before the year closes, and written down in the file where an auditor or a lender can find the reasoning later.
What if I run agency and at-risk engagements in the same year?
Then each engagement is accounted for on its own terms and the two are never merged into one revenue total. This is the practical failure we see most often. A firm that has always been an owner’s representative takes a single at-risk package, the bookkeeper carries on recording nothing but the fee, and the statements stop describing the business. The repair is not difficult but it has to be deliberate. Every engagement gets its contract position recorded, revenue is presented on that basis, the trade cost on at-risk work sits directly below the revenue it belongs to, and the statements disclose that both bases are in use. A reader who cannot tell which revenue is which cannot use the statements for anything at all.
How do I treat reimbursable costs I recharge to the owner?
The analysis that decides your revenue line decides this too. Where you incur a cost as the owner’s agent and simply recover it, the case for netting it against the expense is strong. Where you incur it as a principal and bill it on with your own exposure attached, the case for showing it in revenue with the cost beneath it is strong. We will not prescribe one treatment from here, because it follows the facts of the engagement. What we do insist on is consistency. The same position has to produce the same treatment every time, the basis has to be disclosed, and the support behind each recharge has to exist. Recharges coded three different ways across three years is the quickest way to turn a routine CRA question into a long one.
Does holdback apply to a construction project management firm?
Only where you are a party to the construction contract that creates it, and that is a consequence of the at-risk position. Sign in your own name, hold the trade contracts, and the retention regime that contract sets up is yours to operate and to carry on your balance sheet. Where you act as the owner’s agent you are not a party to those contracts, so the obligation is the owner’s rather than yours, even where you administer it on the owner’s behalf. We deliberately do not set out the mechanics here. Our pages for concrete contractors, excavation companies and the other trade contractors cover that ground properly, because for them it is a daily reality rather than an occasional consequence of how one contract happened to be signed.
Do I have to file T5018 slips?
That has to be determined on your facts, and we will not answer it in either direction from a web page. The contract payment reporting slip applies to a business whose primary business activity is construction and that makes payments to a subcontractor for construction services. Whether a project management firm meets that test depends on what the firm actually does and on the position it holds on each engagement. A firm that never holds a trade contract is in a very different factual position from one that holds them all and carries the cost of the work. Because it turns on the facts, it is a determination you owe yourself rather than an assumption to carry forward from last year, and we make it with you on the evidence in your own contracts.
When is a percentage-of-construction-value fee earned?
When the service it pays for has been performed. Not when the invoice is raised, and not when the money arrives. A fee expressed as a percentage of construction value still has to be earned across the work it relates to, and the same is true of milestone fees and of cost plus arrangements with a guaranteed maximum. Where you have billed ahead of the work, the amount is included in income under paragraph 12(1)(a) of the Income Tax Act, and the offsetting reserve under paragraph 20(1)(m) is what stops you paying tax a year early on services you have not yet provided. That reserve has to be claimed. It is not automatic, and it is the deduction most often left on the table on this file.
When does a retainer become income?
A retainer taken before the work begins is money received for services not yet rendered. It is included in income under paragraph 12(1)(a) of the Income Tax Act in the year you receive it, and the reserve under paragraph 20(1)(m) is then available for the part relating to services still to come, which leaves you taxed on what you have actually earned. In the books it sits in deferred revenue and is released as the work is performed. Two things go wrong here regularly. Firms recognize the whole retainer on receipt and pay tax early, or they leave it sitting in deferred revenue long after the work was done and understate income. Both get found, and the second one is worse.
Do I charge HST on my project management fee?
Yes. A project management service supplied in Ontario is a taxable supply and your fee carries 13%, with input tax credits claimed against it on office rent, software, professional fees, vehicles and the rest of your operating costs. Registration under the Excise Tax Act is required once taxable revenue passes $30,000 over four consecutive calendar quarters, which is worth knowing here because a firm reporting gross at-risk construction value clears that figure on its first project rather than after several years of fee billings. Where a cost is recharged to the owner, the tax treatment follows the same agency-or-principal analysis as the revenue presentation, so it gets settled once for the engagement rather than argued invoice by invoice.
What if an owner does not pay my fee?
There are two distinct claims here, they arise at different points, and collapsing them into a single entry is where this goes wrong. While collection is genuinely in doubt but the debt is still alive, a reserve is available under paragraph 20(1)(l) of the Income Tax Act, and it is looked at again each year on the facts as they then stand. Once the debt has actually become uncollectible, the deduction under paragraph 20(1)(p) is the right one, and the reserve previously claimed comes back into income in that same year. Firms routinely take the write-off while still chasing the money, or hold a doubtful-debt reserve for years after the owner has gone. Keep the two distinct, date them, and keep the collection correspondence that supports whichever one you claimed.
Are site and office staff employees or contractors?
It is decided on the facts of the working relationship rather than on what an agreement or an invoice calls it, and we test and document each role individually. The consequences follow from the answer. An employee means source deductions, a T4, WSIB coverage from the first hire and remittance against the PD7A, with T4 slips and the T4 Summary due by the last day of February and a graduated late-remittance penalty that reaches 10%. A genuinely self-employed adviser paid for services means a T4A instead. Ontario Employer Health Tax becomes payable once your payroll passes the $1,000,000 exemption. Getting a status wrong is expensive in both directions, which is why it is not a question to decide by preference.
What records does CRA want from a construction project management firm?
The rule is section 230 of the Income Tax Act: records good enough that your tax can be determined from them, held for six years. On this file that means something quite specific. The signed management contract for every engagement. The document that establishes whether you were the owner’s agent or a principal on it. The fee basis and how the fee was earned. The support behind every recharged cost. And the trade contracts and trade invoices on the engagements where you held them yourself. Under section 152(7) CRA may assess without relying on the information supplied to it, which is simply how the provision reads. The practical consequence is that a firm whose revenue line has no contract standing behind it has very little to argue with when the assessment arrives.

Related Industries We Serve

Accountant for Land Surveying Companies

  • Professional fee revenue reporting
  • Corporate tax filing and T2 preparation
  • Payroll and source deduction compliance

Accountant for Excavation Companies

  • Equipment capital cost allowance pools
  • Site payroll and WSIB coverage
  • Corporate tax filing and planning

Accountant for Concrete Contractors

  • Trade contract revenue and costing
  • Vehicle and equipment CCA claims
  • Year-end statements and T2 filing

Accountant for Incorporated Businesses

  • T2 preparation with GIFI schedules
  • Owner compensation planning
  • Notice to Reader financial statements

Construction Project Management Accounting & Tax Done Right.

T2 filing on the revenue line your contracts actually support, agency and at-risk engagements reported on their own terms inside the same year, recharged costs on one documented and disclosed treatment, fees billed ahead of the work deferred under paragraph 12(1)(a) of the Income Tax Act with the paragraph 20(1)(m) reserve claimed, the doubtful-debt reserve under 20(1)(l) kept apart from the 20(1)(p) write-off, 13% charged on the fee under the Excise Tax Act with input tax credits recovered, and the site office, furniture and office equipment in Class 8 at 20% with estimating software in Class 12 at 100%. AFFORDABLE flat fees, no hourly billing. Licensed CPA Ontario. 1300+ five-star reviews. 30-Day Money-Back Guarantee.



Scroll to Top